Berlin’s New Data Center Campus for Cloud and AI Providers as well as the Public Sector
BER02 is the first data center on the mainHub Campus in Berlin – a location specifically designed for AI and cloud-scale deployments. Here, you’re right in the heart of Berlin’s fast-growing market, Europe’s emerging Tier II powerhouse. Connected. Powered. Ready to Grow.
BER02
Berlin
Germany
Power Supply
Secured
Ready to Scale?
BER02 is the ideal launchpad for AI and cloud providers looking to scale in the Berlin region. Strategically positioned just outside Berlin, the future campus is engineered for high-density, renewable-energy-powered workloads. mainHub provides up to 186 MW of IT capacity, depending on the design, along with 12,000 sqm (liquid-cooled) or 41,184 sqm (air-cooled) IT whitespace.
Construction
144–186
MW*
IT capacity
443352
ft²*
Whitespace
≤ 1,2
Design PUE
Q1/2028
Expected
*depending on the design
Berlin’s New Campus for AI and Cloud Providers, as Well as the Public Sector
BER02 at the mainHub Campus – strategically located just outside Berlin, in Europe’s burgeoning AI and cloud market, with up to 186 MW of capacity and renewable energy.
BER02: Connected, Powered, Ready to Grow
Perfectly Located
Berlin – led by BER02 – is rapidly emerging as Europe’s Tier II hub. Strategically located to provide geo-redundant support for Frankfurt, it is close to federal institutions, new availability zones, and emerging data center clusters. Powered by local wind and solar energy, our campus offers a prime location with access to verified renewable energy sources – ensuring performance and compliance from Day 1.
Quickly Deployed
Developed by a German provider with deep local expertise, BER02 brings together our operational experience and regional insight to accelerate delivery. Our proven track record in managing complex processes enables us to realize large-scale, high-density deployments faster and more predictably. With technical agility and modular design flexibility, the site provides an ideal foundation for next-generation workloads — from AI to high-performance computing.
Sustainably Designed
Sustainability is at the core of BER02 – in every phase, from planning to execution. The whole campus is engineered to meet the highest ESG standards, with design features that include renewable energy integration, LEED certification, zero process water usage, and extensive greening. This comprehensive approach helps you meet your environmental targets while maintaining a sharp focus on cost efficiency and long-term value. BER02 is not just future-ready – it’s future-responsible.
OVERVIEW
All-in-One Booklet: The BER02 Brochure
In the brochure “BER02: Connected, Powered, Ready to Grow” you will find all the information you need about our new data center near Berlin from the basic concept to a detailed overview of the most important technical specifications. Download it here!

BER02 at a Glance
| IT capacity: 144–186 MW, depending on the design |
| IT area: 12,000–41,184 m² / 129,167–443,352 ft² (across the entire campus), depending on the selected cooling solution |
| High-density racks ready for AI & HPC deployments, depending on cooling technology |
| Flexible and future-proof cooling options: air, liquid, and hybrid |
| Slab-to-slab height and floor load capacity for future rack designs |
| IT rooms can be equipped as necessary (e. g. OCP racks or liquid-to-chip cooling facility) |
| Redundancies: n+1 for the flexible cooling and power supply topologies (block, distributed redundant, catcher or N+2C) |
| 4 entry points for carriers, campus and buildings |
| Design PUE ≤ 1.2 |
| Temperature and humidity: ASHRAE A1 |
| Size of plot: approx. 137,000 m² / 1,475,000 ft² |
| Liquid-cooled: Two individual data halls per building, each offering 1,000 m²/ 10,763 ft² of whitespace Air-cooled: Six individual data halls per building, each offering 1,144 m² / 12,313 ft² of whitespace |
| Dedicated 200 MVA on-site substation with 110/20 kV redundant transformers via a coupled dual busbar |
| Adaptable customer space for both office and secure storage; loading bay for up to 22 prepopulated racks |
| Concept of protected areas with separation and biometric scanning |
| Comprehensive video surveillance system |
| Advanced fire suppression system incl. hybrid water mist & sprinklers (zoned) and VESDA early detection |
| Standard: 24/7/365 access and on-site security staff |
| Up to 48 hours of autonomous operation; priority fuel delivery ensured |
| Risk analysis: no identifiable risks |
| Construction start: Q1/2026 |
| Ready for service BER02: Q1/2028 |
| Location: 52.5935000, 12.8929999 Berliner Straße 14641 Nauen, Germany |
| Direct connection to local wind and solar farms |
| Waste heat recovery for use within the campus and for the provision of local heating via a district heating strategy |
| Carbon life cycle assessments |
| Sustainable construction with green elements such as facades as well as the near-natural design of outdoor areas to promote the microclimate and biodiversity |
| Infiltration system and reduced surface sealing for groundwater protection |
| LEED Gold |
| Eco-Management and Audit Scheme (EMAS) |
| ISO 9001 |
| ISO 14001 |
| ISO 50001 |
| ISO 27001 |
| ISAE 3402 SOC 1 + SOC 2 |
| Design and construction according to EN50600 |
| Customer-specific certification can be provided on request |
Contact
Secure new capacity for your hyperscale needs now with the German market experts.
Leverage our expertise and quickly secure your data center location in Berlin. Rely on sustainable performance with Germany’s fastest-growing provider.